More than 10 years of operation and maintenance in Egypt

Last edited: 06-11-2018

GESOM maintains wind farms in Egypt for more than a decade now. It was in 2006 when GESOM started cooperating in the maintenance of the Zafarana wind farms. At that time GESOM was maintaining 480 turbines (408 MW) distributed in four wind farms. 60 technicians were working at the same time. 

In the present time, GESOM counts on 25 technicians maintaining 240 MW. Some country peculiarities are the 365 days shift and the desert area where the wind farms are located. The huge amount of installed megawatts in the country during the last few years conferred a great potential to Egypt for GESOM activity.